Rhagofalon ar gyfer defnyddio llwyfannau gwaith o'r awyr partr:
1. Any work carried out at a place with a height of 2 meters or more should be regarded as aerial work platforms parts. Any work that can be done on the ground in advance must be done on the ground, as far as possible to reduce aerial work platforms parts.
2. The personnel who work as aerial work platforms parts must be in good health, and suffer from mental illness, epilepsy, hypertension, heart disease, etc., which are not suitable for aerial work platforms parts. When it is found that the staff has drinking and lack of energy, ascending work is prohibited.
3. Aerial work platforms parts must be built with scaffolding or measures to prevent the team from falling before proceeding.
4. Work on dam crests, steep slopes, roofs, cliffs, towers, suspension bridges, and other dangerous edges. Safety nets or protective railings should be installed on the vacant side, otherwise workers must use seat belts.
5. Ice, snow, gravel, and dirt on steep cliffs, steep slopes, or sidewalks must be cleaned frequently, and a 1 meter high rail must be provided on the side outside. On the inside of the railing, an 18 cm high side plate or soil ridge is set to prevent falling objects from hurting people.
6. Work on scaffolds without scaffolding or without railings, the height exceeds 1.5 meters, you must use seat belts, or take other reliable safety measures.
7. The safety belt of aerial work platforms partsr should be checked before use, and the static load test should be carried out regularly (every 6 months). The test load is 225 kg and the test time is 5 minutes. After the test, check whether there is deformation, Crack, etc., and make test records. Unqualified seat belts should be dealt with in time.
8. The hooks or ropes of the seat belts should be hung on strong and firm components or on steel wire ropes for hanging seat belts. Do not hang on moving or loose objects.
9. Tool bags should be used for aerial work platforms parts. Larger tools should be tied to firm components with ropes and not allowed to be placed randomly to prevent accidents from falling from a height.
10. Wrth gyflawni rhannau llwyfannau gwaith awyr, ac eithrio'r personél dan sylw, ni chaniateir i eraill deithio nac aros o dan y gweithle. Dylid gosod ffensys neu ddyfeisiau amddiffyn eraill o dan y gweithle i atal gwrthrychau rhag cwympo rhag brifo pobl. Os ydych chi'n gweithio ar blatfform math grid -, er mwyn atal offer ac offer rhag cwympo, dylid gosod planciau.
11. It is forbidden to throw tools and materials up and down, and use a rope to fasten it and hang it down or up to avoid hurting the staff below or destroying the scaffold.
12. When working on the upper and lower floors at the same time, a tight and firm protective partition, shed or other isolation facilities must be installed in the middle, and the workers must wear safety helmets.
13. Yn y gaeaf, mae rhannau platfformau awyr agored - yn cael eu cynnal ar dymheredd is na minws deg gradd. Os oes angen, dylai fod man gorffwys ar gyfer gwresogi ger yr ardal adeiladu. Dylai'r offer gwresogi gael ei reoli gan berson ymroddedig a rhoi sylw i atal tân.
14. In severe weather such as strong winds of level 6 and above, and heavy weather such as heavy rain, thunder, and fog, the open air aerial work platforms parts should be stopped.
15. It is prohibited to work on unsturdy structures (such as asbestos tile roofs). In order to prevent accidental registration, warning signs should be hung on the necessary places of this structure.